Many communities in The Philippines lack access to affordable power.
HOMER Pro Makes Rural Philippines Microgrids Reliable at Lower Cost
The Challenge
Shell Foundation, Philippines, recently hired consultant Silver Navarro to assist its Dutch consultant with an Access to Energy program promoting Philippines microgrids. The program’s purpose is designing an off-grid power system that the community can sustainably operate and maintain to meet its basic electricity requirement. Navarro’s project was for a community that already possessed several donated diesel gensets, but the cost of fuel made reliable power unaffordable. Delivery delays were an added fuel challenge as the nearby river floods on rainy days. Rainy days do benefit the community’s low-head pico hydro turbine, but water flow is insufficient during summer months.
“Solar PV was an obvious solution to the hydropower deficiency,” says Navarro. Battery sizing is very important due to the high initial cost, but more importantly to the ongoing replacement costs for the batteries.
The Solution
“Using HOMER Pro as a design tool for simulation and optimization,” explains Navarro, “the sizes of the power components were selected properly to meet the capacity and energy requirement of the community with the lowest operating and replacement costs.” Navarro’s video goes into more detail about the project.
The Future
Navarro believes HOMER Pro is an essential tool for optimizing existing Philippine power systems. These are primarily fossil-based generating systems that can be hybridized with PV and wind, then augmented with an energy storage system to reduce operating costs, he says. He further explains that the Small Power Utilities Group of the Philippines’ National Power Corporation (NPC-SPUG) currently operates 529 of these generating units. Only 44% provide 24-hour electricity, with an average of only 18 hours. The high operating costs are passed on to consumers in their electric bills.
The government’s objective is to make electricity available 24 hours a day and lower consumer costs by hybridization with renewables and optimizing operation. Navarro is enthusiastic about using HOMER Pro to build capacity within NPC-SPUG in the same way it helped the Shell Foundation project.
This installment was submitted by Silverio “Silver” Navarro, Jr., a Philippines-based independent renewable energy consultant who uses Homer Pro as a tool in designing clients’ systems and performing analyses. His services include resource assessment, energy audit, power system design, techno-financial analysis, project implementation and management, and performance monitoring, among others.
Your HOMER Pro Story
If you have a story you’d like to share about how you or your organization uses HOMER Pro, please email us with a brief explanation. We’d love to feature you in our blog and newsletter (85,000 opt-in subscribers). For a minor time commitment, you can share your successes with the whole (microgrid) world!
A remarkable project’s impact in all angle.
Good people doing the right thing for a great country.
Thank you for your comment Mr. Nutter.